Tender Notice for the Purchasing and Installation of Street Lamps for Weisan Road and Limin Road, Hanjiang District


Standard category: Domestic bidding fund source: Domestic government fund investment amount: 0 million yuan Region: Anhui details:
Entrusted by the Construction Committee of Wujiang District of Wuhu City, the company will openly invite bids for the purchase and installation of street lamps for Weisan Road and Limin Road in Hanjiang District, and welcome qualified bidders to participate.
1. Content of the bidding:
A tender section: Weisan Road streetlights, including 62 sets of street lights, lighting distribution boxes and power cables (including installation and commissioning).
Second bidding section: Limin Road streetlights, including 73 sets of street lamps, lighting distribution boxes and power cables (including installation and commissioning).
(For details, please refer to the bidding documents and purchase list)
2. Bidder's qualifications:
A manufacturer or agent who has the responsibility of city and road lighting engineering to contract the third-level and above qualifications, and has the above-mentioned cargo supply, installation and after-sales service capabilities. (The project is a simultaneous procurement project on the Internet and offline. Bidders must register as members of the Wuhu Municipal Government Procurement Supplier Bank and apply for CA certification before they can bid for the bidding documents, registration, bidding, and online. For bid opening, please contact the bidder who is interested to come to our office for registration, registration, CA certification and online bidding.)
3. Time and place for the issuance of bidding documents:
The qualified qualified bidder may appoint a representative to hold the power of attorney, the identity card and a copy of the identity card, a copy of the legal person business license (with a copy of the official seal of the unit), and a qualification certificate (with a copy of the official seal of the unit) The information will be registered from April 17, 2009 to April 23, 2009, from 9:00 to 12:00 (excluding holidays), and the tender documents will be received on the afternoon of April 23, 2009.
4. Deadline for bid submission and time for bid opening: May 10, 2009 at 10:00 am Bid Opening Location: Wuhu City
5. Margin: All bidders are required to submit a deposit. The deposit for each bid is RMB RM, and is transferred to the designated account from the bidder's account by transfer, wire transfer or money order within three working days before the bid opening date. Bids that have not submitted a deposit will not be accepted.
6. Bid Integrity Margin: All bidders are required to submit the bidding integrity deposit, and the bid security guarantee for each bid is RMB 10,000. The bidding, wire transfer or money order will be transferred to the designated account below for three working days before the bid opening date. The bids that are overdue or fail to submit the bid security deposit will not be accepted.


Contact: Xia Xue

phone

fax

EPON OLT

Advantages of EPON:
EPON adopts a point-to-multipoint structure and passive optical fiber transmission mode to provide multiple services on Ethernet. EPON technology integrates low-cost, high-bandwidth Ethernet equipment and low-cost optical fiber network technology. Compared with other access technologies, it has unique advantages, which are mainly reflected in the following aspects.
Good compatibility: EPON uses Ethernet technology, which is by far the most successful and mature LAN technology, and it can be said to be the mainstream of user LAN technology. Because EPON is only based on the existing IEEE 802.3 protocol, and realizes the transmission of Ethernet frames in the user access network through minor modifications and additions, EPON is basically compatible with Ethernet technology. Using Ethernet as the access network has low cost and good versatility, avoids complicated transmission protocols and format conversion, high efficiency, and simple management.
Low construction and maintenance costs: The EPON system significantly reduces the number of optical fibers, optical transceiver modules, and central office equipment. As the cost of optoelectronic devices continues to decrease, EPON`s per-line equipment access cost is comparable to ADSL and CM, especially the current price of optical fiber is lower than that of cable. These conditions have become the basis for the development of FTTH. At the same time, the foundation of EPON is Ethernet, and related components and equipment of Ethernet are the lowest in price. Using EPON as the access network has low cost and good versatility, eliminating the need for IP data transmission protocol and format conversion. High efficiency and simple management. In addition, there are only passive optical components such as optical fiber and optical splitter between the central office (OLT) and the user (ONU). There is no need to rent a computer room, no power supply, and no active equipment maintenance personnel. Therefore, it can effectively save operation and maintenance. cost.
High bandwidth: EPON can currently provide a downlink transmission rate of 1. 25 Gb/s, a single-wavelength uplink rate of 125 Mb/s, and can be upgraded to 1 GB/s with the development of Ethernet technology. This is much higher than the current access methods, which can meet the bandwidth requirements of various services such as broadband Internet access, video on demand, online games, video phones, and digital high-definition televisions, and fully meet the bandwidth requirements of access network customers. And it can easily and flexibly allocate bandwidth dynamically according to changes in user requirements, which can be used as the user's ultimate access method.

Epon Olt,EPON OLT 4PON port,Epon 8pon OLT,Electronic Port,EPON 2 PON OLT

Shenzhen GL-COM Technology CO.,LTD. , https://www.szglcom.com