Temporary workers violated regulations and many people were electrocuted

First, the accident passed

On a certain day, a chemical shock and casualty accident occurred in the salt storage of a chemical plant storage and transportation office, causing 6 people to be electrocuted and 3 people to die. On the morning of the same day, 10 people in the salt storage warehouse of the chemical plant storage and transportation office were prepared to apply salt, but the 10-meter-long belt conveyor was in a disadvantageous position. They moved the machine from northwest to east under the command of the team leader Feng. After a short stop, I feel that it is not suitable and I still need to adjust to the east. When the adjustment is made again, the single phase of the three-phase power supply in the power supply box on the device is single-phase grounded, causing the device casing to be charged, resulting in an accident.

Second, the cause of the accident

l When the temporary worker is on the mobile device, the incoming power on the operation box is not cut off.

2. The mobile belt conveyor did not install grounding or zeroing according to the regulations, nor did it install a leakage safety device. The rated voltage of the equipment is 380V, and a four-core cable should be used. When the machine is installed, a three-core cable is used. The power cord is not fastened with the clip at the entrance of the operation box (iron), but is simply wrapped with the hemp rope of the seam salt and is loose. In the operation box, there were originally three 15 amp screw insurances. After the insurance was replaced several times, the left and middle two phases were wound up and down with a fuse. The intermediate phase safety seat is fixed by two screws. There is only one one. The fixing is not fixed. In the process of moving the belt conveyor, the power cord is loose, and the screw safety base in the operation box is pulled to the left, resulting in the middle phase power supply line and The fuse is in contact with the iron plate of the operating box to energize the entire device.

3. Management of temporary workers is confusing. Temporary workers entering the factory, the labor and management department did not go through the formalities, the safety department did not file the case, but after a private introduction, the warehouse agreed to work in the salt store, did not sign the employment contract according to the regulations, did not carry out pre-job safety education, and there was no temporary Work management system.

Third, preventive measures

1. In strict accordance with the safety production rules and regulations of the unit, special operations must strictly adhere to the system of holding the certificate, so that “there must be a certificate for the job, no certificate and no job”.

2. Leaders at all levels of the unit, especially the supervisors of safety production work, must be conscientious and responsible. Rules and regulations and operating procedures are drawn from summing up past experiences and lessons and should be strictly observed. The act of not following the rules and regulations should be stopped, and the accident should be eliminated in the bud.

3. Strengthen the safety production management of employees, include temporary workers and migrant workers in safety training and management, complete the same vocational skills training and safety training as formal employees, and effectively improve the safety awareness of such workers.