The tender number bidding code: CBL_20161115_188878002 Bulletin category: Domestic tender Tenderee: Datang Shanxi New Energy Co., Ltd. Source of funds: Others (Part 2 of Bidding) Datang Shanxi Co., Ltd. Decentralized 28.5MW Wind Farm Project Power Generation Lines and Booster Station Expansion Construction Tender Notice Project Name: Datang Shanxi Bifurcation of 28.5MW Wind Farm Project Collecting Line and Boosting Station Expansion Construction Bidding No.: CWEME-201612SXKL-S001 Tenderee: Datang Shanxi New Energy Co., Ltd. Bidding method: Domestic open tendering Type of tender: Project tender Area: Shanxi Industry sector: Energy According to the "PRC Bidding Law," "The People's Republic of China Tendering and Bidding Law Implementation Regulations" and relevant laws and regulations, follow public, fair and just With the principle of honesty and credit, entrusted by Datang Shanxi New Energy Co., Ltd., domestic open tendering for the construction of the data collection circuit and booster station expansion of the Datang Shanxi Xun distributed 28.5MW wind farm project is welcomed. participate. I. Project Description: The tendered project Datangyu Distributed 28.5MW wind power project has been approved by the Shanxi Provincial Development and Reform Commission under the name of Jinfafa Energy (2014) No. 1617. The owner of the project is Datang Shanxi New Energy Co., Ltd. The project investor and proportion is Datang Shanxi New Energy Co., Ltd. has a ratio of 100%; the capital source is project capital and financing, and the capital ratio is 20%. The bidder was Datang Shanxi New Energy Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing open bidding. Construction Site: Jing County, Zhuozhou City, Shanxi Province Construction scale: 28.5MW Plan duration: May 1, 2017 to March 20, 2018, 324 calendar days. Second, the scope of the tender: Expansion and installation of booster stations, and collector circuits (including the construction of the lines and equipment for the high-voltage side of the fan transformer to the terminal tower). Third, the bidder's qualification requirements: 3.1 The bidder must have independent legal person qualifications and corresponding construction qualification conditions. Non-PRC registered bidders should be registered by the Administration for Industry and Commerce, and the competent construction department should issue a contracted project permit to issue a permit. 3.2 The bid invitation requires the bidder to have the qualification for general contracting of power engineering construction or the qualification of professional contractor for power transmission and transformation projects with grades of at least Grade A and above. In the past 5 years, the construction performance of 2 or more wind farms with 50 MW and above or similar projects must be completed. , and have corresponding construction capabilities in personnel, equipment, funds, and so on. 3.2.1 Among them, the bidder intends to send the project manager to be qualified as a qualified mechanical and electrical professional registered construction engineer, has an effective safety production assessment certificate (B), and has not held any other engineering project manager in progress, and has 5 More than a year engaged in similar project management work experience and served as a project manager for 2 or more wind farms of 50MW or above or similar projects. 3.2.2 The license for the installation of electric power facilities of Grade II (trial) and the Measures for the Administration of Licenses for the Installation (Repair, Trial) of Electric Power Facilities (Decree No. 28 of the State Electricity Regulatory Commission). 3.2.3 Passed GB/T 19001-2008/ISO 9001:2008 Quality Management System, GB/T 24001-2004/ISO 14001:2004 Environmental Management System, GB/T 28001-2011/OHSAS 18001:2007 Occupational Health and Safety Management System Certification. 3.3 Corporate Finance: The registered capital is not less than RMB 10,000. 3.4 Corporate reputation: The bidder needs to have good credit standing and business reputation. There is no legal dissolution of the case or the company is out of business or in bankruptcy, and the assets have not been reorganized, taken over and frozen. 3.5 The Commonwealth does not accept bids from the Commonwealth. 3.6 The tender will be conducted after the qualification examination. After the bid opening, the bid evaluation committee will review the bidder's qualifications. The qualification conditions do not meet the requirements of the bidding documents. The bid evaluation committee will reject the bid. Fourth, the tender documents obtained: 4.1 How to Obtain Bidding Documents: (.) 4.2 Bidding Documents Available: November 15 to November 25, 2016. 4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids. V. Submission of tender documents: 5.1 Deadline for submitting tender documents (Bid deadline, the same below): December 10, 2016, 10:00 am. 5.3 Submission methods: Prior to the deadline for submitting tender documents, potential bidders submit paper tender documents and their electronic versions according to the requirements of the tender documents, and complete the electronic uploading and uploading of electronic tender documents. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee. Contact: Zhang Jie Mobile: 1312 111 5668 phone fax E-mail: In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.